Tuesday 13 January 2004

The Pen Pushers Posse Pogrom

The equines of time
Pressure at work emanates from a disconnect between what needs to be done and who can achieve it within the strictures defined outside one's control.
Usually, project managers, the harbingers of the technician's heartache, heartburn and consequent heart attack control the parameters of time that have one as bellows in a accordion.
The compression and extension producing melodious music to the ears of kamikaze management promising what they cannot deliver on the blood of their underlings drowns the cries of pain, as the music is the accompaniment to a frenzied foxtrot.
Beaten at their rotten game with integrity
It ought not to be so, just as brinksmanship is used to force the impossible into reality, a master equestrian can arrest the megalomania of micro-project objectives that titillate the Project Manager and redefine in terms that lay bare the achievable over the downright absurd within your timescales.
Except if 12 hours can be wrung out of eight normal working hours, additional resourcing is required the absence of which simply introduces a temporary setback allowing an opportunity to deliver late based on technical reality rather than project idealisms.
I am no hamster
One being at a point of being pressured unduly by escalations of multiple priorities drawing on one's reserves, the flustered man obtained an open cheque to estimate times to delivery.
So one did, liberally and sensibly, to their chagrin. The equestrian's mastery is in understanding the horse so that it does the bidding of the rider without hesitation, in the manner, one played for time and gained the reprieve that put the blood pressure within the confines of health young man.
One would deliver when one can, if needed faster, the Project Manager would have to shop for a hamster in a wheel.