Friday, 27 November 2026

A Project in All but Name

Where the Pressure Began

I now have the opportunity to reflect on how things at work eventually panned out.

In acknowledging how this journey began, six months ago at the end of May when the ideas were first mooted, my technical lead and I were unpersuadable. It was my technical lead who then assigned me the role of managing this through to implementation, which carried with it the job of challenging the technical feasibility of the concept, and I was entrusted with ensuring that the solution, in whatever guise it finally took, would be supportable at deployment.

Each successive month thereafter saw me increasingly devoted to managing the concept whilst holding back the pressure to deploy, until it became much clearer how the proposed solution could be both managed and broadly supported.

Just over two months ago, an explicit demand was made for 100% of my time on this activity. My team also lost a critical technical resource to a function that had all the makings of a project but was never formalised, defined, or funded.

A Project in All but Name

This became an extreme example of scope creep. The chief architect, who originated the concept and sits high up in the technical hierarchy, proposed a set of cosmetic changes observed on a singular and unrepresentative device and account.

Those changes were then mistakenly sold to the customer, or believed by them, as a panacea for all the performance issues contributing to the productivity loss the executive board was trying to arrest. In consequence, the work garnered the highest visibility and profile, and so there had to be results.

That is what scope creep looks like in practice. A set of ideas concerned with nothing more than marginal changes to improve performance ballooned into a high-profile, impactful and resource-heavy activity, a major project in everything but name, and without any of the definition, formality, or funding that the name would have brought with it.

It is worth dwelling on that, because it explains almost everything that went wrong along the way. Had this been a clearly defined project from the outset, things might well have been under far better control, since the mechanisms for that control already exist and we use them all the time.

Instead, it proceeded under the radar, largely because the business had made immediate implementation an imperative, and an imperative does not queue up politely behind governance. The pressure from the business and the scope creep then fed each other, and between them they exacerbated every difficulty we encountered.

Naming Things by Function

For every name that visited what this programme was supposed to do, we eventually settled, broadly, on laptop remediation. That was because, as the implementor, I had it totally within my gift to set the definition and nomenclature for ease of administration.

In my technical career, I have always tried to name things by function and operation, so that an implementation is already self-documenting before you have to look under the bonnet to see what the engine does.

From Scripts to Compliance

It is worth saying what actually got deployed, because it was neither of the two things we spent months arguing about. The scripts were never the solution; they became the proof of concept, the demonstration that the ideas did work, whilst remaining something no one else could realistically support.

Converting those scripts to policy was the next step, and it came about through the questions and challenges my technical lead kept posing, which made the script route untenable. That conversion brought its own difficulty. We ended up with four separate policies, and policies offer no guarantee of the order in which they run. The scripts had given us that sequence for free; the policies could not, and unpredictable timing is not something you turn loose on an estate whilst hoping for the best.

The answer was to take every setting out of those policies and express each one as an individual configuration item, then gather the whole lot into a single configuration baseline. That baseline does two things at once: it looks for whether a setting is present, and it puts the setting right if it is absent. The fulfilment of all those settings, device by device, is what we now call compliance. Where the scripts were a recipe that had to be followed in strict order, the baseline is closer to an inspection: it checks each item on its own merits and corrects what it finds wanting, whenever it looks.

So the long argument was not wasted, and neither side of it was simply wrong. Each stage was a step towards something better, and the refinements the ideas underwent, under challenge, have left us with a better solution for everyone.

An AI-generated infographic on the blog content. (Click to enlarge.)

Due Process and Results

Having then arrived at a deployable solution, and for various interesting reasons addressed in a series of previous workplace experience blogs, we found the whole activity had by now been forced into an ordered due process setting under change management control principles.

That allowed for easy tranche deployment and progress reporting. The deployment ran through November and took just over two weeks, and every end-of-day report presented success rates of over 80%. Now, a week after the change was completed, we are knocking on 97% compliance.

Those compliance figures should not be confused with the user reports, as the two belong to entirely different timeframes and measure different things. Compliance tells us whether a device has received and retained its settings.

The user reports came from a much earlier stage, when people were telling us what they were still experiencing, and just 0.092% of them reported persistent issues. We have since delivered a separate tweak to that group, so they are not simply left waiting on the main deployment.

Recognition Without Reward

There are no new figures to report on the money, and cost savings will only be measurable in due course. What we do have is the noticeable improvement in performance reported by the user community, which, set against that fraction of a per cent still reporting problems, suggests to me that this was a success.

In the commendation of my contribution to this project, delivered as feedback in my annual performance assessment, the same chief architect whose concept this had been from the outset stated that without my involvement, the whole thing, from idea to full deployment, would have failed. I think that was a generous assessment of things.

When we finally got this out, there were plaudits and thanks all round, from the client's executive board and our own top management, mostly in terms of us as a team, when we could have been individually named. It remains a team effort, and I would not want it described as anything else.

My premise, though, is a simple one: recognition should come with quantifiable reward. Warm words that cost nothing are pleasant enough, but they are not the same as recompense, and we all know the difference. I would have liked the acknowledgement to have come with reward too, but here we are, and we will take whatever acknowledgement is given.

Three People, One Outcome

There were three key personnel involved, along with the essential project coordinator, who must have wondered what hard luck it was to be lumbered with these seemingly difficult project resources.

There was the person who grappled with the issue, laying out a range of ideas to be developed into a deployable solution. There was the person who would not be satisfied to proceed if key supportability was not integral to it. And there was the person whose late arrival to the project, bringing a new set of eyes and ears to what we were doing, unblocked the impasse and reimagined the framework. That gave the impetus to go for a solution path first suggested at the outset but never focused on.

What Finally Shifted Things

It was a confluence of things rather than any single intervention. The bad communication forced a rethink of what was actually happening. The institution demanded change controls. Management tried to enforce an emergency change, which, as I had argued for months, it never was.

So it was both a personal victory, in that common sense prevailed, and a systemic correction, because the poor communication exposed the impactful consequence of making that kind of change across all systems. Had the communication gone out as drafted, the panic would have been the least of it.

Someone had to hold the line, and on this occasion it happened to be me. I make no great claim for that, since I am sure professionals on other projects do exactly the same thing every day of the week. It simply had to be done rather more insistently here, and that was the nature of a high-profile non-project in which the usual controls were never put in place to begin with.

The Cost of Standing Firm

I am satisfied that, despite the pressures and power plays, we have achieved a resounding success. It is one that includes input from a broader team that challenged, questioned, reviewed, or even opposed some of the ideas, leading to the qualitative refinements that produced a product we can now be proud to support going forward.

The cost of it should not go unmentioned. At one point it was quite debilitating, enough to leave me so highly stressed that I felt totally sick, which resulted in days off work.

I recovered well, and my persistent argument on feasibility and supportability eventually won, but in the middle of it all I could not see things working out. Yet somehow, the way I marshal my abilities seems to result in things being done the way I want them done.

Sweeping Up, Looking Back

We are now in sweep-up territory, thinking of a few other tweaks and of how to handle those who were in the original pilot of the proof of concept. That cohort makes up just 0.53% of the total deployment, and they will be dealt with as part of the sweep-up and review.

That was the solution I determined at the time to be a work of art, the one for which I used the analogy that you could not get another artist to daub on a Picasso, so unmanageable and unsupportable was it, even though it worked.

I guess this is what long years of experience bring to the table: the ability to articulate the difficult, to withstand powerful pressure, and to advocate for why anything we deploy must include easy supportability, or we do not have a solution but an inscrutable black box that no one can fix if it breaks.

Finally, there is the ability to persuade everyone of the need to follow due process, which is what ensures everything works as intended. There is more to be said, but I am quite thankful for what I can now report on.

Related blogs

Blog - Stewarding the Use of Power

Blog - The Folly of Promises Before Practicalities

Blog - A Picasso No One Can Repaint

Blog - You Do Not Get A Painter to Fix Another's Art

Blog - Badly Designed Systems Are Just That

Blog - Authority Without Consent

A Gemini Notebook AI Podcast on this blog

No comments:

Post a Comment

Comments are accepted if in context to the blog, polite and hopefully without the use of expletives.
Please, show your name instead of defaulting to Anonymous, it helps to know who is commenting.
Links should only refer to the commenter's profile, not to businesses or promotions, as they will NOT be published.
Thank you for commenting on my blog.